Italian Prime Minister Matteo Renzi, Enel CEO Francesco Starace, Enel Green Power CEO Francesco Venturini and Nevada Governor Brian Sandoval, today attended the inauguration of Enel Green Power’s Stillwater renewable hybrid facility in Fallon, Nevada.
Stillwater is the world’s first power plant to combine medium enthalpy, binary cycle geothermal, solar thermal and solar photovoltaic technologies at the same site.
The event was also attended by the Director of the National Renewable Energy Laboratory (NREL) Dr. Martin Keller, U.S. Senator Dean Heller, U.S. Representative Mark Amodei and other U.S. national, state and local dignitaries.