Webpages

Thursday, March 1, 2018

Netherlands: Successful Flow Test at Trias Westland Geothermal Heat Project

Trias Westland: Successful production test of the Lower Cretaceous (T&A Survey Group B.V.)

(Courtesy T&A Survey Group B.V.) 
Yesterday Trias Westland performed the production test in the Lower Cretaceous Reservoir. Water from a depth of 2.3 kilometers was pumped up. The test went very well. The hot water flowed very smoothly into the basin and the gas in the water was flared off. Samples have been taken and measurements have been made  to determine, among other things, the pressure and temperature.

With this information the project team can start with the realization of the heat network. The exact potential of the geothermal doublet will be known at the end of April, when the second well has been drilled and tested.

Read More.........

From the Global Geothermal News archives: