Thursday, September 14, 2017

Science & Technology: Enel Looking for Innovation in H2S Abatement in Geothermal Power Plants

An alternative solution for H2S abatement in geothermal power plants

Challenge Expiration Date: October 12, 2017
Reward: 15,000 (c. $17,800)


Enel Green Power is looking for novel solutions to maximize H2S abatement in geothermal power plants and at the same time reducing the OPEX associated with needs of chemicals. Moreover, the present end-cycle effect of the AMIS® (Abatement of Mercury and Hydrogen Sulfide) process is quite good: no materials from the reactions outcomes are handled as solid waste nor sulfur cake are produced to be reprocessed. These condition should not be penalized (or even better improved) by the proposed solutions.