KS Orka is looking for an experienced Commercial Manager to join their Indonesian management team.
This is an expatriate position and will report directly to the President Director.
The candidate should have professional qualifications, preferably in Law, and have EPC and drilling contract experience. Experience working in South East Asia will be an advantage.
If you feel you may fit these high level criteria, please reply and a position description will be provided to suitable candidates. Contact us at: info@ksorka.com
Sorik Merapi 240 MW is one of the largest greenfield projects in Indonesia. KS ORKA is the 95% owner and developer of the project. Drilling works are progressing with two drilling rigs at the site.
From the Global Geothermal News archive:
- Thursday, September 7, 2017 - Indonesia: First Unit at 240 MW Sorik Marapi Geothermal Power Project Could Be Operating Within a Few Months
- Thursday, April 13, 2017 - Indonesia: Testing Continues at the 240 MW Sorik Marapi Geothermal Power Project
- Friday, February 3, 2017 - Indonesia: First Three Wells At Sorik Marapi Project Close to Completion