Grupo Dragon to commission 25.5 MW Unit 3 at Domo de San Pedro (Think GeoEnergy)
Grupo Dragon will commission Unit 3 on the Domo de San Pedro Geothermal field next week; a year ahead of schedule thanks to the smart use of 2 back-pressure units to do well testing.
Grupo Dragon has recently announced that a 3rd unit has been completed and will be soon commissioned on the Domo de San Pedro geothermal field, located in San Pedro Lagunillas, Nayarit - the first private geothermal field in Mexico. The condensing unit with an installed capacity of 25.5 MW will be connected to the national grid in the last week of April.
Read More........