GDA designed the plant and supplied major equipment, including the steam turbine generator sets. GDA also manufactured auxiliary equipment packages to minimize installation time, including the lube oil system, turbine inlet control valve assembly, and the plant control system. The equipment and materials were shipped from GDA in 12 shipping containers during July and August of 2013.
The Ulumbu geothermal field is located 13 km to the south of Ruteng, the capital of Central Manggarai Regency, Flores Island, in the East Nusa Tenggara Province of Indonesia.
Read More......