Germencik geothermal power plant |
The No.2 unit at the plant, which is located 60 km south of Izmir, Turkey's third-largest city, is slated to go on stream in 2015.
Mitsubishi Power Systems Americas will have a booth at the GEA Expo run in conjunction with the GRC Annual Meeting, Sept. 29-Oct. 2 at the MGM Grand, Las Vegas, Nevada.
Read More.....