Wednesday, April 11, 2012

Australia:



Geodynamics Limited, operator of the Innamincka Deeps Joint Venture, is pleased to advise that it has completed drilling the 406mm (16") section of the Habanero 4 well to the target depth of 2,256m.

The Joint Venture is currently working with surface equipment in preparation for casing and cementing the 406mm (16") section. Operations are also being prepared to remove the surface Blow Out Preventer (BOP) equipment and install and test the high pressure BOP equipment, before drilling ahead in the next 311mm (12 ¼") section.