Climeon has received an order from Iwana Power GK of Heat Power modules worth SEK 40 million. The Heat Power modules will be deployed as a geothermal power plant in the Gifu Prefecture in central Japan and are to be delivered in 2019.
The order is placed by the Heat Power Operator Iwana Power GK, part owned by Baseload Power Japan and local entrepreneurs.