Friday, December 14, 2018

Germany: Second Well Successfully Drilled at Munich Geothermal District Heating Project

Pump tests successfully completed for the second well of the Schäftlarnstraße project (Erdwerk)

On 10.12.2018, the pump tests for the second geothermal well of the SWM geothermal project Schäftlarnstraße (Munich) were successfully completed.

The second well was drilled as planned from the Southern Heating Power Plant, deviated to the southeast and reached a final depth of more than 3 km, with a total drilling distance of more than 4 km.

In the coming days, the final works shall be carried out on the well before the rig is moved to the next well location, immediately adjacent.

The drilling of the third (from a total of six) deep well is scheduled to begin in January 2019.

Read More........