Drilling for Electricity, Part Four - A Personal Perspective on the Pagosa Springs Geothermal Project (Pagosa Daily Post)
(Video: 4:18 Minutes)
The problems at the drilling site, located across Highway 84 from the Archuleta County Road and Bridge offices, had to due with hitting artesian water. As we mentioned yesterday, drilling company DOSECC Exploratory Services had been hired by local alternative energy company Pagosa Verde LLC to produce maybe 2,000 feet of geologic core samples at each of six exploratory sites. Each drilled well would then be utilized by geologists to run a series of temperate and sonic tests, with the idea of understanding the composition of the rocks underlying this particular area of Archuleta County — thinking that, maybe, this understanding will then lead Pagosa Verde and the Pagosa Area Water and Power Authority to find the Holy Grail of Geothermal Water. That is to say, water that is hotter than 250 degrees, hot enough to run an electric turbine…
Read More.......
Part One...... Part Two..... Part Three.......