Monday, January 23, 2012

USA, Nevada:

BLM Signs Decision Record for Dixie Geothermal Project (Lahontan Valley News)

The Bureau of Land Management (BLM), Carson City District, Stillwater Field Office, issued on Thursday the Decision Record (DR) for the final environmental assessment (EA) for the Dixie Meadows Geothermal Exploration Project proposed by Ormat Technologies, Inc.

The decision is for the BLM to implement the Proposed Action alternative. The geothermal exploration project is in Dixie Valley approximately 75 miles northeast of Fallon.


The EA analyzed potential impacts on the natural and human environment that could result from implementation of the geothermal exploration and testing project on federal lands.

The primary objective of the project is to further evaluate the characteristics of the geothermal resources in the Dixie Meadows Project area. The proposed activities
  • Constructing new access roads 
  • Upgrading existing access roads 
  • Constructing up to 20 well pads 
  • Drilling and completing temperature gradient wells, observation wells, production wells and 1-2 water wells 
  • Expand one minerals material site and construct one new materials site 
  • Install a temporary above-ground water distribution pipe line 
  • Construct or install necessary ancillary facilities including a temporary personnel camp 
The EA was made available for a 30-day public review/comment period. The BLM received comments from the Nevada Department of Wildlife, Nevada Division of State Lands and State Lands Use Planning Agency, Nevada State Historic Preservation Office, Nevada Department of Transportation and Naval Air Station Fallon, Nevada. All comments received were reviewed, considered and minor changes were made to the content of the Final EA.

A determination has been made that implementation of the Proposed Action would not result in “significant environmental impacts,” to the natural and human environment, therefore a Finding of No Significant Impact (FONSI) has been prepared separately to document that determination, and a Decision Record has been issued providing the rational for approving The Proposed Action Alternative.

The final EA, FONSI and DR are available at the following:

http://www.blm.gov/nv/st/en/fo/carson_city_field/blm_information/nepa/nepa_archives .html.