One of two new 49.9-MW geothermal plants is already operating at full capacity in Imperial Valley, California near the Salton Sea. It was originally called Hudson Ranch I, but renamed later to John L. Featherstone Plant, to honor a geothermal expert. This new plant is the first of its kind built in the area for twenty years. The second 49.9-MW geothermal project is called Hudson Ranch II and construction is slated to begin in 2013, with a 2015 finish date. Each new plant has been said to be able to generate enough power for 50,000 homes.